Evance pioneers renewable energy
technology and is a global supplier of energy systems for on and off
grid applications. The highest
standards of design are used to guide the development and marketing of
products and solutions with class leading quality, performance and
reliability with a five year
guarantee.
Under theFeed
in Tarriff schemethe
Evance R9000 would attract 28p per Kwh of electricity produced.
The
Evance R9000
-
is manufactured in Leicestershire, a leading manufacturer of small wind
turbines delivering efficient renewable energy solutions. This 5kW
turbine is the most efficient small scale wind turbine available and is
one of only four turbines to have FULL MCS certification.
The
Evance R9000 is what’s known as an “up wind” turbine and will
rotate according to the wind direction to ensure it is always fully
utilising the wind available. A clever and yet simple control of the
blade pitch angle (Reactive Pitchtm)
regulates the speed of the turbine. This turbine starts generating at
3.0 m/s (6.0mph) and will continue producing right up to 60 m/s
(134mph). Choice of tower heights for the R9000 are 10m, 12m, 15m, and
18m all of which are lowered to the ground hydraulically. In terms of
servicing this is a huge benefit as the entire tower and turbine nacelle
can simply be lowered to the ground using a portable hydraulic ram
system and hydraulic supply.
The
installation of a R9000 wind turbine is carried out by trained
installers, who in the UK are also MCS accredited.
The installation process
includes:
1.)
Tower foundation & cable trench
2.)
Electrical This illustration is
for a twin tower installation.
3.)
Tower installation. The tower comes in
sections.
4.)
Turbine installation
5.)
Commissioning
Once
all elements are in place, the R9000 will be commissioned. Then
clean renewable energy can be generated - reducing your carbon
footprint and saving you money.
We
understand that operational time is important to our customers,
therefore we offer a full support service through our resellers.
We recommend an annual
maintenance check for the R9000 turbine and its supporting tower
which covers: Tower and Supporting Structure Core Unit and Yaw
System Pitch System Blades Electrical Equipment &
Connections After the service the R9000 will be re-commissioned.
Work on the turbine should
only be carried out by fully trained and certified personnel who
are familiar with the machine and with Evance maintenance
procedures.
Desk Top study
If you would like to us to carry
out a desk top study which includes calculating your wind speed, assessing the suitability for a turbine on your property and providing an
estimated income chart please feel free to contact
us
"It is important as a farmer to reduce my carbon footprint
and as I live in windy West Wales the decision was taken to
erect two 5Kw wind turbine through Davies Implements. The Evance
R9000 seemed to be my best option as it wasn't an enormous
investment and predicting a good return on my investment.
The whole installment was very professionally carried out and
only took 3½ days in total. Each turbine only takes up 1m2
of land, making this the most profitable 2m2 on my
farm. The turbines have now been running for over 3 weeks now
and have surpassed the predicted generation by 10%.What else,
except feed in tariffs, over a guaranteed index linked income
for 20 years."