Home

New Machinery

Used Machinery

Hire News About Us Contact us

Home
Up
Evance Wind Turbines
Endurance Wind Turbine
Feed in Tariffs
Annual mean wind speed
Turbine Location & planning
Picture Gallery

endurance logo.gif (10381 bytes)

The Endurance E- 3120 – A 50kW turbine manufactured in Canada with a 20 year design life. This turbine sits on a fixed tower of either 24m or 36m. These turbines are also very efficient, having a 19m diameter rotor they produce huge amounts of energy from lower wind speeds. Approximately 169,000kWh from just 6 m/s and will start generating from only 3.5m/s with a survival wind speed of 52m/s (116 mph). The Endurance has also been designed to be very quiet and the noise levels will not interrupt a conversation when stood at the base.

Under the Feed in Tarriff scheme the Endurance E-3120 would attract 25.3p per kwh of electricity produced. 

Estimated Annual income
Wind Speed (m/s) Annual Income

5.5 m/s

£37,913.44

6.5 m/s

£51,228.77

7.5 m/s

£62,620.26

Estimated Annual production

Wind Speed (m/s)

Annual Production

5.5 m/s

142,240 kWh

6.5 m/s

194,253 kWh

7.5 m/s

238,751 kWh

Specification

Tower Heights – 24m & 36m
Tower Type - Monopole
Architecture – Downwind
Cut in wind speed – 3.5m/s
Cut out wind speed – 25m/s
Survival wind speed – 52m/s
Rotor Diameter – 19.2m
Braking – Rapid Fail- Safe Dual Mechanical Brakes
Yaw Control – Active Yaw Control (Dog Vane)
Design Life – 20 years (Annual Service & Maintenance

  

Endurance features and specification leaflet

 

 

What we can do for you

Income_chart.png (227163 bytes)

REAL_CMYK jpeg.png (250557 bytes)

MCSlogo.PNG (65308 bytes)

ü Desk Top study
If you would like to us to carry out a desk top study which includes calculating your wind speed, assessing the suitability for a turbine on your property and providing an estimated income chart please feel free to contact us
ü Site Survey
Once you have received a desk top study and feel that the you would like us to call for a site survey
we  would be more than happy to do so. For more details click here
ü Planning Permission
Wind turbines will require full planning permission and in most circumstances planning will be granted, however, it is not a straight forward process and will require a specialist planning consultant. We employ the services of a wind turbine planning consultant and as yet have not had a wind turbine application rejected and has succeeded in getting a wind turbine application granted in an 'Area of Outstanding Natural Beauty' and a 'Coastal national park'.
For more details click here
ü Installation
We will install and commission the turbine
.
Evance (5kw) Endurance (50kw) Feed-inTariffs National wind speed Planning & Site survey
 
facebook-logo.PNG (84423 bytes) Sales
New Machinery sales       
Used Machinery sales
Hire
Hire    
Terms & conditions of hire
Company Information
News      
About Us
Contact us
Aftersales Service