daviesimplementsltd.co.uk

lumbermate.jpg (44427 bytes)

Home New Machinery Used Machinery Hire News About Us Contact us

Home
Up
Access plaftorms
Albutt
Allman Sprayers
ATV equipment
Atmos Boilers
AW Trailers
Bilke processors
C-Dax sprayers
Compact tractors
Draper
Drum Mowers
Dual Spreaders
Efco
Eliet Shredders
Flail Mowers
Farmi Forestry
Forestry grapples and rotators
Forestry Trailers & Cranes
Forestry woodcrackers
Forestry Winches
Fraser muck spreaders
Hakki Pilke processors
Kranzle pressure washers
LumberMate Saw mills
Kuhn
Loaders
Logsplitters
Mics
Opico Grass Harrow
Orsi Hedgecutters
Post hole borers
Post Knockers
Pottinger
Rayco Stump grinders
Ritchie
Saw Benches
Wind Turbines
Weidemann loaders
Woodchippers
Zetor tractors

 

UK 24m tower.JPG (15692 bytes)

 

Wind Turbines

evance logo.png (103288 bytes)        endurance logo.gif (10381 bytes)

Since the introduction of the Feed-inTariffs (FIT's) launched 1st April 2010 owning a wind turbine in not only a green option but a very sound long term investment and attractive business proposition, particularly if the installation is made on a non commercial basis as you will receive tax free income by selling your electricity back to the grid. Basically, This scheme will reward householders, businesses and communities who generate their own electricity from renewable or low carbon sources such as wind turbines and the higher the wind speed the better the returns. Those who install a wind turbine will now benefit from the new tariff in three ways; 

lower energy bills, 
payments from electricity they feed back into the grid,
Payment from the FIT for all the energy they generate. 

We can offer 2 turbines from Evance (5kw) and Endurance (50kw). For further information on each turbine please select below:

What can we do for you

Income_chart.png (227163 bytes)

 

REAL_CMYK jpeg.png (250557 bytes)

MCSlogo.PNG (65308 bytes)

ü Desk Top study
If you would like to us to carry out a desk top study which includes calculating your wind speed, assessing the suitability for a turbine on your property and providing an estimated income chart please feel free to contact us
ü Site Survey
Once you have received a desk top study and feel that the you would like us to call for a site survey
we  would be more than happy to do so. For more details click here
ü Planning Permission
Wind turbines will require full planning permission and in most circumstances planning will be granted, however, it is not a straight forward process and will require a specialist planning consultant. We employ the services of a wind turbine planning consultant and as yet have not had a wind turbine application rejected and has succeeded in getting a wind turbine application granted in an 'Area of Outstanding Beauty' and a 'Coastal national Park'. For more details click here
ü Finance
We are able to offer finance to farmers and businesses in the form of hire purchase from a few finance companies. For more details please contact us.
ü Installation
We will install and commission the turbine
.
 

facebook-logo.PNG (84423 bytes)
[
Home ]  [ New Machinery ]  [ Used Machinery ]  [ Hire ]  [ News ]  [ About Us ]  [ Contact us ]

Website designed by Davies Implements Ltd Blaenteg,,Trevaughan,,Carmarthen,,SA313QN..Telephone:.01267.237726