Home

New Machinery

Used Machinery

Hire News About Us Contact us

Home
Up
Evance Wind Turbines
Endurance Wind Turbine
Feed in Tariffs
Annual mean wind speed
Turbine Location & planning
Picture Gallery

Wind Turbine Installs

treberferdd evance wind turbine install.PNG (3701322 bytes)

Install near Dihewyd, Lampeter

treberferdd evance wind turbine install.1.PNG (3238395 bytes) treberferdd evance wind turbine install.2.PNG (402270 bytes)
6 turbine delivery by frenni (2).jpg (1101581 bytes) 6 turbine delivery by frenni (9).jpg (1003655 bytes) 6 turbine delivery by frenni (20).jpg (1242055 bytes)
Above - 6 Evance turbines arriving into stock late February 2012
6 Turbine delivery (1).JPG (2391782 bytes) 6 Turbine delivery (2).JPG (2056488 bytes) 6 Turbine delivery.JPG (2447521 bytes)
Above - 6 Evance turbines arriving into stock in October 2011
Three turbine delivery (9).JPG (1967359 bytes) Andrew Thomas install (10).JPG (2404480 bytes) Andrew Thomas install (5).JPG (3058080 bytes)

Above - Turbines being delivered 

Above - Turbine install at Lanbister, Llandrindod Wells
Clive Breeze (3).JPG (578951 bytes)

Clive breeze install (10).JPG (2471431 bytes)

Clive Breeze (6).JPG (2663612 bytes)
Clive breeze install (11).JPG (2144326 bytes)

"It is important as a farmer to reduce my carbon footprint and as I live in windy West Wales the decision was taken to erect two 5Kw wind turbine through Davies Implements. The Evance R9000 seemed to be my best option as it wasn't an enormous investment and predicting a good return on my investment. The whole installment was very professionally carried out and only took 3½ days in total. Each turbine only takes up 1m2 of land, making this the most profitable 2m2 on my farm. The turbines have now been running for over 3 weeks now and have surpassed the predicted generation by 10%. What else, except feed in tariffs, over a guaranteed index linked income for 20 years."

Clive Breeze (5).JPG (2377267 bytes)
Goodhead install (18).jpg (555668 bytes) Goodhead install (11).jpg (716389 bytes)
P1060054.JPG (2432352 bytes) P1060061.JPG (2306400 bytes) P1060068.JPG (2436445 bytes)
Above twin trubine install for Mr. C. Breeze In Cilrhedyn, Pembrokeshire
 
facebook-logo.PNG (84423 bytes) Sales
New Machinery sales       
Used Machinery sales
Hire
Hire    
Terms & conditions of hire
Company Information
News      
About Us
Contact us
Aftersales Service